- The current work plan for the property was completed last Friday, April 17, as previously communicated. The remaining work that was originally planned has been placed on hold.
- Moving forward, we do not anticipate significant site activity over the next one to two months. On-site activities will be limited to surveying, sampling, testing, and monitoring. Should more substantial work be required to complete our engineering submission, we will provide sufficient advance notice.
- We will continue to conduct regular site visits to monitor stormwater flow through the property and to ensure that all measures remain effective.
7000 Campeau Drive – Communication Update – April 24, 2026